completedSolar Water System
Barangay Garing, Consolacion, Cebu
Construction of a solar-powered water system serving a remote community site.Approved company work
Only Super Admin-approved public projects assigned to PHILIN Industrial appear here.
completedBarangay Garing, Consolacion, Cebu
Construction of a solar-powered water system serving a remote community site.
completedPililla, Rizal
Deep-well construction supporting the Sembrano Wind Power project.
completedSanta Barbara, Pangasinan
Screw-pile installation and associated solar-farm construction works.
completedBugallon, Pangasinan
Screw-pile installation for a utility-scale solar power project.
completedBugallon, Pangasinan
Screw-pile, mounting-structure, and photovoltaic installation works.
completedSan Marcelino, Zambales
Forty-two 1.2-meter boreholes to 20 meters depth plus construction support for a 600-meter bridge structure.
completedBauan, Batangas
Thirty bored piles measuring 1.2 meters in diameter and 20 meters in depth.
completedLower Bicutan, Taguig
Installation of 107 bored piles measuring 800 mm in diameter and 21 meters in depth.
completedDagupan City, Pangasinan
Construction works for the Zambales Road to Judge Jose de Venecia Boulevard Extension, Package 2.
completedTubod, Surigao del Norte
Construction of four dewatering wells for mining and site operations.
completedBarangay Pangan-an, Lapu-Lapu City, Cebu
Construction and rehabilitation works for water supply, septage, sewerage, rainwater collection, filtration, and desalination.
completedBacolod
Foundation and installation support for a utility-scale solar power development.
completedBugallon, Pangasinan
Solar foundation and installation works for a 25 MWp development.
completedSan Pablo, Isabela
Solar foundation and site installation works, now completed.
completedAjuy, Iloilo
Solar foundation and site installation works, now completed.
completedAlaminos, Pangasinan
Erection and field construction support for a 500 kV transmission line.
completedBugallon, Pangasinan
Erection and field construction support for a 500 kV transmission line.
completedCavite
Installation and construction support for 24 Type 6 prestressed girders.
completedIlocos Norte
Bore-pile construction measuring 2.5 meters in diameter and 45 meters in depth.
completedLower Bicutan, Taguig
Installation of 107 piles measuring 800 mm in diameter and 25 meters in depth.
completedSta. Cruz, Angat, Bulacan
Six 1.5-meter boreholes to 20 meters depth with bridge-structure works.
completedBarangay Sta. Rita, Masinloc, Zambales
Bridge-construction and foundation works.
completedBarangay Cayanga, San Fabian, Pangasinan
Bridge-foundation and structural construction works.
completedCandon, Ilocos Sur
Bridge-foundation and structural construction works.
completedRosales, Pangasinan
Bridge-foundation and structural construction works.
completedLabey Road, Bokod, Benguet
Slope-protection and stabilization works in mountainous terrain.
completedCaramoran, Catanduanes
Slope-protection and stabilization works along Catanduanes Road.
completedSta. Praxedes, Cagayan
Slope-protection and stabilization works along the Cadcadir-Kabugao Road.
completedLubang, Occidental Mindoro
Slope-protection and stabilization works along Tagbac-Looc Road.